For an efficient work, before the waterproofing process of a terrace (this case) or a roof, follow this steps:
- clean the substrate
- examine the surfaces to be waterproofed;
- prepare the surfaces;
- check and renovate the joints and the wells;
- proceed to the waterproofing of joints and drains.